24x7 emergency breakdown support for societies and industries. Call +91 84510 56919
Annual Maintenance Contracts

Stop Paying for Breakdowns. Prevent Them.

With 500+ AMCs managed across Mumbai, we know one thing for certain: scheduled maintenance costs far less than downtime. Choose the plan that fits your building.

AMC Plans

Three Ways to Cover Your Building

Scope and visit frequency are tailored to your equipment after a site assessment.

Pump & Motor AMC

Every pump and motor in the building serviced on a fixed schedule, from domestic supply and boosters to fire-fighting sets.

  • Scheduled cleaning and servicing of pumps and starters
  • Bearing, seal and winding condition checks
  • Pressure and flow testing with readings recorded
  • Priority 24x7 breakdown response
Get AMC Quote

Electrical AMC

Panels, wiring and common-area systems inspected before they fail, keeping the building safe and audit-ready.

  • Panel inspection, tightening and thermal checks
  • Earthing and safety compliance checks
  • Common-area lighting and DG changeover upkeep
  • Fault attendance with priority response
Get AMC Quote
Most Popular

Combined Society AMC

The most popular plan: one contract, one accountable team for both the pump room and the electrical systems.

  • Everything in the pump and electrical plans
  • Single point of contact for the committee
  • One consolidated report after every visit
  • Best value for housing societies
Get AMC Quote
Why an AMC

What Your Building Gains

The case committees make to their members when they sign an AMC.

Fewer Breakdowns

Wear is caught during scheduled visits, not at 7 am when the water stops.

Written Reports

Every visit ends with a report the committee can file and audit.

Priority Response

AMC clients jump the queue when an emergency does happen.

Predictable Budgets

A fixed yearly cost instead of surprise repair invoices.

Our Process

From Inspection to AMC Support

A disciplined six-step engineering process, so nothing is guessed and nothing is skipped.

01

Inspection

We visit your site and examine pumps, motors and panels first-hand.

02

Diagnosis

Root cause identified and a clear written quote shared.

03

Repair

Trained technicians carry out the work with genuine parts.

04

Testing

Load, pressure and safety tests before we call it done.

05

Commissioning

Systems handed over running, with everything explained.

06

AMC Support

Scheduled preventive care and priority breakdown response.

AMC Questions

Before You Sign

How is the AMC cost decided?

It depends on the number of pumps, motors and panels, the building's size and the visit frequency you choose. We inspect the site first, then give the committee a written quote with the full scope listed. There are no hidden charges.

How often do you visit under an AMC?

Most societies choose monthly or quarterly preventive visits, with breakdown visits whenever needed in between. Frequency is set in the contract based on your equipment and its age.

Are spare parts included in the AMC?

Routine consumables and labour are covered as per the agreed scope. Major spares are quoted separately at transparent rates before any work, so the committee always approves costs first.

Can we switch to you mid-year from another contractor?

Yes. We start with a condition audit of your pumps, motors and panels, document everything in writing, and take over from your current arrangement without downtime.

See all frequently asked questions

Pump trouble or an electrical fault in your building?

Book a site visit, request an AMC quote, or reach our 24x7 emergency line. We respond fast.